Type your paragraph here.

John Law Floodplain Residental Flood Risk Reduction Project

The challenges of this project are many but the biggest issue is the dewatering. We have 3- 4" pumps that run 24 hours  a day 7 days a week just to keep the water at a manageable level.

Pinewood Springs Road & Bridges 

This project included building a new bridge over the Little Thompson River as well as repair on 2 other bridges that were damaged in the 2013 Colorado Flood.

This was a Larimer County project with FEMA funding


Poudre River Pedistrian Bridge

City of Fort Collins